BEAUTIFUL STONE ENSEMBLE. MAIN HOUSE. GUEST HOUSE. SWIMMING POOL. BARN SUPERB TRANQUIL LOCATION BUT NEAR FACILTIES.
Réf. : AP2189
Property for Sale House / Character property ST CYPRIEN AREA
Description
Beautiful stone perigordin ensemble, 4 km from the shops, renovated and well maintained,
Main House has three bedrooms and their is a lovely one bedroom independent guest house
A Stone barn on 2 levels dated 1774, Swimming pool 9x5 with paved terracing.
The property is set in well landscaped gardens just under an acre, enclosed by a gate and stone walls. There is an old tobacco barn set slightly apart.
Price agency fees INCLUDED:
392 200 €
Price agency fees EXCLUDED:
370 000 €
Agency fees of 6,00%, all tax included, to be paid by the buyer
4 Bedrooms
7 Rooms
Garage: 1 car(s)
Living space: 140 m²
Land surface:
1 600 m²
Property tax:
1 600 €
Area: ST CYPRIEN AREA
Environment: Hamlet
Condition: Good
Orientation: East West
Kitchen: Opened
Heating: None
Style: Stone
Details
Property location
Hamlet
Non isolated countryside
Ground floor
Utility Room
Bedroom(s)
Kitchen(s)
Dressing room(s)
Open plan living area
Washroom(s)
Terrace(s)
Heating
Wood insert
Electricity and wood
Central heating with heat pump. air air and insert
Electrical equipment
Alarm
Electric Shutters
Land
Swimming pool(s)
Land Approx 1600m2 enclosed, low walls and gate.
Rightmove infos
Feature 1 STONE ENSEMBLE
Feature 2 NEAR ST CYPRIEN / SIORAC
Feature 3 MAIN HOUSE AND GUEST HOUSE
Feature 4 SWIMMING POOL
Feature 5 BARN
Feature 6 3MINS SHOPS
Feature 7 20 MIONS SARLAT
Feature 8 50-60MINS BERGERAC & BRIVE AIRPORTS
Region DORDOGNE
Garden Level
Basement / Cellar
Outbuildings
Lean-to
Barn
House d'amis, in stone, near the swimming pool, compris
Other equipment
Septic tank
Enclosed Fireplace
Windows
Double Glazing
Services
Nearest town : ST CVYPRIEN & SIORAC
Nearest shops : 3MINS
Nearest motorway : A20/A89
Nearest airport : BERGERAC - 55MINS
Consommation énergétique (en énergie primaire) Energy performance int(180)
Energy Performance Diagnosis (Energy report)
Date of Energy Performance Diagnosis completion : 2025